Things never seem to slow down, particularly on your existing subsea project. While all this activity is going on with the new oil zones, SIT issues,

Things never seem to slow down, particularly on your existing subsea project. While all this activity is going on with the new oil zones, SIT issues, you and your team have to keep up with the design, procurement, fabrication, testing and installation scope for the rest of the subsea project.

The latest problem involves the subsea connectors used throughout your project. Before you hired on, decisions were made to use an older model so-called legacy connection system, which had been used successfully in the past in this area by your company. This particular connection system had not been used in a long time by anyone, and although this connection system load capacities were known, there has been a change to the API Standards that require connector load capacities be re-calculated using different methods and factors. And while your new order for the old design connection system was progressing for your project, the revised design calculations were made, and they are sitting on your desk for review. As your luck would have it, to general surprise the calculations using the current methods proved the connector load capacities to be much smaller than previously shown in the legacy project documentation, which was all that your company had when the decision was made to use this system. Changing the connector system to a different design is a last resort, as it would delay the project by more than a year. You have been asked to investigate this and recommend an action plan.

Question 1. What are the minimum ten key concerns here, and what are your recommendations for how to approach this?

 

In: Mechanical Engineering

Get your Custom paper done as per your instructions !

Order Now