Assignment 5.1: Estimate the Cost of a Project

Assignment 5.1: Estimate the Cost of a Project.

In this application, you will prepare a cost estimate of your project.

Procedure

  1. Using a spreadsheet, prepare a roll-up estimate of your project costs. To prepare your estimate, follow these guidelines:

     

    • Use a completely decomposed WBS as your basis.
    • Identify your labor resource requirements against the WBS.
    • Assume non-labor estimates are accounted for and not part of this assignment.
    • Attach is the project schedule with the decomposed WBS.

Assignment 5.1: Estimate the Cost of a Project

Get your Custom paper done as per your instructions !

Order Now